Search scope:
排序: Display mode:
Synchronous grouting of large diameter slurry shield in water-rich sandy gravel stratum
Zhang Changqiang,Zhai Zhiguo,Chen Mingjuan,Jin Zhongxiang
Strategic Study of CAE 2010, Volume 12, Issue 12, Pages 75-78
Keywords: sandy gravel stratum slurry shield synchronous grouting construction technology
Experimental study on pile-end post-grouting piles for super-large bridge pile foundations
Weiming GONG, Guoliang DAI, Haowen ZHANG
Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 2, Pages 228-233 doi: 10.1007/s11709-009-0019-0
Keywords: self-balanced testing technique pile-end post-grouting bearing capacity grouting technology
Frontiers of Structural and Civil Engineering Pages 827-854 doi: 10.1007/s11709-023-0954-1
Keywords: seismic performance continuous girder bridge grouting sleeve-prestressed tendon composite connections
Modeling and control of a permanent magnet synchronous generator dedicated to standalone wind energy
Louar FATEH,Ouari AHMED,Omeiri AMAR,Djellad ABDELHAK,Bouras LAKHDAR
Frontiers in Energy 2016, Volume 10, Issue 2, Pages 155-163 doi: 10.1007/s11708-016-0410-1
Keywords: wind turbine permanent magnet synchronous generator (PMSG) converter proportional-integral (PI) control
Anti-erosion elastic coating design based on synchronous fluctuation principle
Guo Yuanjun,Xiao Hualin,Xu Daqing,Li Wenbin
Strategic Study of CAE 2008, Volume 10, Issue 9, Pages 60-63
Keywords: erosion boundary layer elastic channel border elastic coating synchronous fluctuation
Zhang Minqing,Zhang Mei
Strategic Study of CAE 2009, Volume 11, Issue 12, Pages 26-34
Keywords: high-pressure water-rich fault unevenness blocking water and strengthen by grouting outside blockand inside solid grouting innovation
Study on the grouting technology adopted in F1 weathered trough for Xiamen Xiang’an Subsea Tunnel
Guo Xiaohong,Wang Mengshu
Strategic Study of CAE 2011, Volume 13, Issue 9, Pages 38-41
Keywords: Ximen Xiang’an Subsea Tunnel grouting reinforcement stability numerical simulation
Clearance grouting process test of Three Gorges Project ship lift rack and nut column
Zhan Jianxia and Li Jihu
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 45-49
In order to choose the suitable grouting material and grouting process, and simulate the actual situation of clearance grouting of rack and nut column in ship lift, groutingComparing three kinds of domestic grouting material and the German PAGEL grouting material in groutingIn prototype grouting test, selection of the grouting equipment type, mixing time, templates seal, methodof grouting parameters control of grouting flow were researched, and some applicable grouting material
Keywords: rack nut column grouting ship lift Three Gorges Project
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault
Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG
Frontiers of Structural and Civil Engineering 2019, Volume 13, Issue 6, Pages 1393-1404 doi: 10.1007/s11709-019-0563-1
Keywords: pre-grouting stability analysis factor of safety discontinuity layout optimization
Hao WANG, Fengge ZHANG, Tao GUAN, Siyang YU
Frontiers of Mechanical Engineering 2017, Volume 12, Issue 3, Pages 420-426 doi: 10.1007/s11465-017-0439-9
A brushless electrically excited synchronous generator (BEESG) with a hybrid rotor is a novel electricallyexcited synchronous generator.
Keywords: wind power brushless electrically excited synchronous generator hybrid rotor equivalent circuit
Ridha CHEIKH, Arezki MENACER, L. CHRIFI-ALAOUI, Said DRID
Frontiers in Energy 2020, Volume 14, Issue 1, Pages 180-191 doi: 10.1007/s11708-018-0537-3
Keywords: permanent magnet synchronous generator wind energy conversion system stochastic differential geometric
Synchronous observation of rising soluble bubble through quiescent solution
Yifu ZHANG , Shuai TIAN , Weizhong LI , Yongchen SONG ,
Frontiers in Energy 2009, Volume 3, Issue 3, Pages 307-312 doi: 10.1007/s11708-009-0028-7
Keywords: soluble bubble mass transfer synchronous observation computer image processing
Qi-huai CHEN,Qing-feng WANG,Tao WANG
Frontiers of Information Technology & Electronic Engineering 2015, Volume 16, Issue 11, Pages 957-968 doi: 10.1631/FITEE.1500056
Keywords: Hybrid hydraulic excavator (HHE) Finite element method (FEM) Interior permanent-magnet (PM) motor PM synchronous
Temperature Prediction for Sun Synchronous Satellite on Orbit
Wei Chuanfeng,Li Yunze,Yuan Lingshuang,Wang Jun,Ning Xianwen
Strategic Study of CAE 2005, Volume 7, Issue 2, Pages 73-75
Temperature prediction on-line for sun synchronous satellite is very essential.
Keywords: sun synchronous satellite on orbit temperature predict
Jingjing ZHAN,Qiao ZHANG,Momei QIN,Yu HONG
Frontiers of Environmental Science & Engineering 2016, Volume 10, Issue 3, Pages 548-558 doi: 10.1007/s11783-016-0831-4
Keywords: freshwater microalgae biomass production lipid accumulation nutrient removal
Title Author Date Type Operation
Synchronous grouting of large diameter slurry shield in water-rich sandy gravel stratum
Zhang Changqiang,Zhai Zhiguo,Chen Mingjuan,Jin Zhongxiang
Journal Article
Experimental study on pile-end post-grouting piles for super-large bridge pile foundations
Weiming GONG, Guoliang DAI, Haowen ZHANG
Journal Article
Seismic performance of fabricated continuous girder bridge with grouting sleeve-prestressed tendon composite
Journal Article
Modeling and control of a permanent magnet synchronous generator dedicated to standalone wind energy
Louar FATEH,Ouari AHMED,Omeiri AMAR,Djellad ABDELHAK,Bouras LAKHDAR
Journal Article
Anti-erosion elastic coating design based on synchronous fluctuation principle
Guo Yuanjun,Xiao Hualin,Xu Daqing,Li Wenbin
Journal Article
ideas and engineering practice of high-pressure water-rich fault “outside block and inside strenghthen grouting
Zhang Minqing,Zhang Mei
Journal Article
Study on the grouting technology adopted in F1 weathered trough for Xiamen Xiang’an Subsea Tunnel
Guo Xiaohong,Wang Mengshu
Journal Article
Clearance grouting process test of Three Gorges Project ship lift rack and nut column
Zhan Jianxia and Li Jihu
Journal Article
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault
Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG
Journal Article
Equivalent circuit and characteristic simulation of a brushless electrically excited synchronous wind
Hao WANG, Fengge ZHANG, Tao GUAN, Siyang YU
Journal Article
Robust nonlinear control via feedback linearization and Lyapunov theory for permanent magnet synchronous
Ridha CHEIKH, Arezki MENACER, L. CHRIFI-ALAOUI, Said DRID
Journal Article
Synchronous observation of rising soluble bubble through quiescent solution
Yifu ZHANG , Shuai TIAN , Weizhong LI , Yongchen SONG ,
Journal Article
Optimization design of an interior permanent-magnet synchronous machine for a hybrid hydraulic excavator
Qi-huai CHEN,Qing-feng WANG,Tao WANG
Journal Article
Temperature Prediction for Sun Synchronous Satellite on Orbit
Wei Chuanfeng,Li Yunze,Yuan Lingshuang,Wang Jun,Ning Xianwen
Journal Article